sales@velocityequipments.com | Worldwide Tender Supply

Steam Turbine Power Plant Setup Suppliers India, Kenya, Brazil, Dubai & Worldwide

ISO 9001:2015
50+ Countries
Tender BOQ Supply
Installation & Training
Steam Turbine Power Plant Setup
Quality Assured Worldwide Shipping

Steam Turbine Power Plant Setup

Code: VELOCITY-EQP40-3400021 Category: Thermal Engineering Lab Equipment

Tender Supply Worldwide: Steam Turbine Power Plant Setup for supply in Lab Brazil, TVET Mexico, TVET Colombia, Lab Argentina, Peru, Lab Venezuela, TVET Chile, Ecuador Lab Exporters, Guatemala, Cuba, Haiti, Bolivia, Dominican Republic, Lab Honduras, Steam Turbine Power Plant Setup TVET Lab Paraguay, El Salvador, Nicaragua, Costa Rica, Puerto Rico, Panama, Uruguay Lab Suppliers, Algeria, Steam Turbine Power Plant Setup Egypt, Morocco, Tunisia, Burundi, Comoros, Djibouti, Eritrea, Ethiopia, Exporters Kenya, Madagascar, Malawi, Mauritius, Mayotte, Suppliers Mozambique, Rwanda, Somalia, Lab Uganda, Steam Turbine Power Plant Setup Tanzania, Zambia, Lab Zimbabwe, Angola, Cameroon, Lab Central African Republic, Chad, Lab Congo, Botswana, Lesotho, Namibia, Lab South Africa, Swaziland, Benin, Steam Turbine Power Plant Setup Gambia, Lab Ghana, Guinea, Guinea-Bissau, Liberia, Mali, Mauritania, Niger, Nigeria, Lab Senegal, Steam Turbine Power Plant Setup Sierra Leone, Togo Suppliers

Tags: Steam Turbine Power Plant Setup

  • ISO 9001:2015 certified manufacturing
  • Tender BOQ ready — ASTM/BS/EN/IS compliant
  • 1 Year warranty
  • Installation and training

2571

  • Description

Product Description

Steam Turbine Power Plant Setup

Technical Specification

An oil-fired once-through steam boiler produces wet steam that is turned into superheated steam by means of a super heater.
The boiler’s short heat-up time means rapid steam generation is possible.
Load is applied to the turbine with a generator.
The turbine output is determined by speed and torque.
The feed water circuit is fitted with a complete water treatment system, which consists of a regenerable ion exchanger and chemical dosing.
Downstream of the turbine, the steam is condensed and returned to the boiler.  
Sensors record the temperature, pressure, speed, and flow rate at all relevant points.
The measured values can be read on digital displays.
At the same time, the measured values can also be transmitted directly to a PC via USB.
The data acquisition software is included.
The control panel includes a clear process schematic of the plant.
The system is monitored and controlled by a programmable logic controller (PLC).
The experimental plant is built in accordance with statutory safety regulations and includes the mandatory safety facilities.
The steam generator is type tested and does not require specific permissions.
The plant can optionally be operated with the cooling tower.

Steam power plant and its components
Start-up, operation and shut down of a steam power plant
Closed steam-water circuit with feed water treatment

Among others, determining:
Boiler efficiency
Mechanical/thermal efficiency of the turbine
Condenser efficiency
Specific fuel consumption of the plant

Trusted Manufacturer

Why Buy Steam Turbine Power Plant Setup from Velocity?

Certified Quality

ISO 9001 Certified

Tender Compliant

Specifications match ASTM, BS, EN, IS & AASHTO standards for BOQ.

Export Packing

Sea/air-worthy packaging suitable for global tender shipments.

Support

Installation and Training

Related Products

More Steam Turbine Power Plant Setup & Lab Equipment

Explore our complete catalog of Civil Engineering Lab Equipment, Industrial Testing Lab Equipment, Mechanical Engineering Lab Equipment and TVET Workshop Tools — engineered, calibrated and manufactured in India for global tender supply. As ISO 9001:2015 certified Steam Turbine Power Plant Setup suppliers and exporters to 50+ countries, Velocity Equipments delivers tender-ready BOQ pricing, ASTM/BS/EN/IS compliance and turnkey lab commissioning. Browse related products below to build a complete laboratory solution alongside your Steam Turbine Power Plant Setup requirement — or submit your tender BOQ for a fully-compliant 24-hour quotation.